Construction works for the restoration of the historic building were the demolition of the old plaster walls, ceiling and roof demolition, masonry, plaster, and shaping reinforced concrete placing.
The basement has an Igloo, imported from Italy, which consists of cutting and removing PAMA to a depth of approximately 40 cm, then pouring concrete slab. Igloo system is applied again after the concrete is poured to reach the level. New floor tiles prepares for commissioning. Also, It has been cleaned of old brick walls and ceiling, and has been applied with water repellent treatment.
Coordination Process
During the construction of any project, the coordination of the trades is an integral part of the process, especially with respect to the mechanical and electrical trades. Morbi in sem quis dui placerat ornare. Pellentesque odio nisi, euismod in, pharetra a, ultricies in, diam. Sed arcu. Cras consequat.